146 campuses · 89.5 GW planned · 21.9 GW of IT power expected online by end of 2026 (incl. estimates)
CampusCountryOperatorPlanned ▼End 2026First powerPower pathGrid / partnerSlipGateLast update
Wonder Valley
MD of Greenview (south of Grande Prairie), Alberta, Canada
Community opposition
Canada Wonder Valley (O'Leary Ventures)7.5 GW0 MW—On-site generationCanada— 4 steps without a public date—
ByteDance Ulanqab Expansion
Ulanqab, Inner Mongolia, China
China ByteDance5.5 GW0 MW2028-03-31Grid supplyChinaon time 3 steps without a public date—
Scala AI City
Eldorado do Sul, Rio Grande do Sul, Brazil
Brazil Scala Data Centers4.8 GW54 MW2026-06-30Grid supplyBrazilon time energized—
Elea Rio AI City
Rio de Janeiro, Brazil
Renewables / PPA
Brazil Elea Data Centers3.2 GW80 MW est2026-12-31Grid supplyBrazilon time 3 steps without a public date—
Haenam Solar City AI Data Center
Haenam, Jeollanam-do, South Korea
Renewables / PPA
South Korea Stock Farm Road3.0 GW0 MW2028-12-31 estHybrid: on-site bridge, then gridSouth Korea— 5 steps without a public date—
Syncline Energy Melbourne Hub
North-west Melbourne, Victoria, Australia
Renewables / PPA
Australia Syncline Energy2.4 GW0 MW—Grid supplyAustralia— 3 steps without a public date—
Microsoft Fairwater Wisconsin
Mount Pleasant, WI
Rate or tariff fight
United States Microsoft2.3 GW369 MW2026-04-16 estGrid supplyMISO
We Energies (WEC)
— energized2026-10-04
Western Downs Digital Park (Anthropic)
Dalby, Queensland, Australia
Financing
Australia Zerra DC2.2 GW0 MW2027-12-31Grid supplyAustraliaon time 3 steps without a public date—
Envision Galaxy Campus Ulanqab
Ulanqab, Inner Mongolia, China
Renewables / PPA
China Envision2.0 GW2.0 GW2026-08-06Hybrid: on-site bridge, then gridChinaon time energized—
Anthropic-Amazon New Carlisle
New Carlisle, IN
New utility generation
United States Amazon1.9 GW1.0 GW est2025-06-23 estGrid, with new utility generationPJM
Indiana Michigan Power (AEP)
— energized2026-10-04
Meta Sturgeon County
Sturgeon County, Alberta, Canada
Canada Meta1.8 GW0 MW2028-12-31Grid, with new utility generationCanadaon time 4 steps without a public date—
OpenAI Stargate New Mexico
Doña Ana County, NM
FinancingOn-site generationPermit disputepermit_dispute
United States Oracle1.8 GW0 MW2026-12-31On-site generationWECC
Bloom Energy / BorderPlex Digital Assets
— Major equipment on site 8 mo past deadline2026-10-05
Meta Hyperion
Holly Ridge, Richland Parish, LA
New utility generation
United States Meta1.6 GW0 MW est2028-01-01Grid, with new utility generationMISO
Entergy Louisiana
on time New generation online 7 mo past deadline2026-10-04
Colossus 2
South Memphis, TN
community_oppositionOn-site generationPermit disputepermit_disputeRenewables / PPA
United States SpaceXAI1.5 GW946 MW2025-10-19 estHybrid: on-site bridge, then gridTVA
MLGW (TVA)
— energized2026-10-04
Reliance Visakhapatnam AI Cluster
Visakhapatnam, Andhra Pradesh, India
Renewables / PPA
India Reliance Industries1.5 GW0 MW2028-10-31Hybrid: on-site bridge, then gridIndiaon time 5 steps without a public date—
OpenAI Stargate Shackelford
Shackelford County, TX
On-site generationRenewables / PPA
United States Oracle1.4 GW0 MW2026-12-01Hybrid: on-site bridge, then gridERCOT
VoltaGrid
+8 mo 3 steps without a public date2026-10-04
CDC Wagga Wagga Campus
Wagga Wagga, NSW, Australia
Renewables / PPA
Australia CDC Data Centres1.4 GW0 MW—Grid supplyAustralia— 3 steps without a public date—
Campus AI Paris (Fouju)
Fouju, Seine-et-Marne, France
France MGX / Bpifrance / Mistral AI / Nvidia1.4 GW0 MW2028-06-30Grid supplyFranceon time 3 steps without a public date—
Bell AI Fabric Sherwood
RM of Sherwood (Regina), Saskatchewan, Canada
Canada Bell Canada1.2 GW0 MW2027-06-30Grid supplyCanadaon time 3 steps without a public date—
QTS Cedar Rapids
Fairfax, IA
United States —1.1 GW448 MW est2026-12-31Grid supplyMISO
Alliant Energy
on time 1 step without a public date2026-10-04
Meta Prometheus
New Albany, OH
Nuclear supplyOn-site generation
United States Meta1.0 GW676 MW est2025-10-14 estHybrid: on-site bridge, then gridPJM
Williams (Will-Power OH)
— energized2026-10-04
Goodnight
Claude (Armstrong County), TX
Curtailment orderOn-site generationRenewables / PPA
United States Google1.0 GW0 MW2027-12-31Hybrid: on-site bridge, then gridERCOT
Serena (Goodnight Wind); Crusoe
on time 3 steps without a public date2026-10-04
OpenAI Stargate UAE
Abu Dhabi, United Arab Emirates
Nuclear supplyRenewables / PPA
United Arab Emirates G421.0 GW200 MW est2026-09-30Grid supplyUnited Arab Emirates
EWEC / Khazna (G42)
+2 mo 2 steps without a public date2026-10-04
SK-AWS Ulsan AI Data Center
Ulsan (Mipo), South Korea
South Korea for Amazon1.0 GW0 MW2027-11-30Grid supplySouth Koreaon time 3 steps without a public date—
Google Visakhapatnam AI Hub
Visakhapatnam, Andhra Pradesh, India
India Google1.0 GW0 MW2028-12-31Grid supplyIndiaon time 3 steps without a public date—
Microsoft-G42 Olkaria Kenya
Naivasha (Olkaria), Kenya
Renewables / PPA
Kenya EcoCloud1.0 GW0 MW—Grid supplyKenya— 3 steps without a public date—
ByteDance Pecém
Pecém (São Gonçalo do Amarante), Ceará, Brazil
Renewables / PPA
Brazil ByteDance1.0 GW0 MW2027-09-30Grid supplyBrazilon time 3 steps without a public date—
OpenAI Stargate Michigan
Saline Township, MI
Financing
United States Oracle988 MW0 MW—Grid supplyMISO
DTE Electric
on time (build-out) 2 steps without a public date2026-10-04
OpenAI Stargate Wisconsin
Port Washington, WI
Renewables / PPATransmission delay
United States Oracle902 MW0 MW2028-06-30 estGrid supplyMISO
We Energies (WEC); American Transmission Co.
on time (build-out) 1 step without a public date2026-10-04
CloudHQ Querétaro
Querétaro, Mexico
Mexico CloudHQ900 MW0 MW2027-06-30Grid supplyMexicoon time 3 steps without a public date—
Google Fort Wayne
Fort Wayne, IN
United States Google863 MW173 MW est2026-09-15 estGrid supplyPJM
Indiana Michigan Power (AEP)
— energized2026-10-04
OpenAI Stargate Milam
Milam County, TX
On-site generationRenewables / PPA
United States Softbank857 MW0 MW2026-10-31Hybrid: on-site bridge, then gridERCOT
SB Energy
on time (build-out) 3 steps without a public date2026-10-05
OpenAI Stargate Abilene
Abilene, TX
FinancingOn-site generationRenewables / PPA
United States Oracle843 MW843 MW est2025-09-30Hybrid: on-site bridge, then gridERCOT
AEP Texas
on time energized2026-10-04
Amazon Ridgeland
Ridgeland, MS
Community oppositionNew utility generationRenewables / PPA
United States Amazon840 MW228 MW2026-05-15 estGrid, with new utility generationMISO
Entergy Mississippi
— energized2026-10-04
Brookfield Strängnäs AI Hub
Strängnäs, Sweden
Sweden Brookfield750 MW0 MW—Grid supplySweden— 3 steps without a public date—
QTS Cambois (Blyth)
Cambois, Northumberland, United Kingdom
United Kingdom QTS (Blackstone)720 MW0 MW—Grid supplyUnited Kingdom— 3 steps without a public date—
VNET Bayin Ulanqab
Ulanqab, Inner Mongolia, China
China VNET700 MW221 MW2025-07-01 estunknownChina
State Grid Inner Mongolia (territory estimate)
— energized—
Amazon Madison Mega Site
Madison County, MS
Renewables / PPA
United States Amazon683 MW284 MW2025-06-23 estGrid, with new utility generationMISO
Entergy Mississippi
+2 mo (build-out) energized2026-10-04
Crusoe Abilene Expansion
Abilene, TX
Community oppositionOn-site generationPermit dispute
United States Microsoft672 MW0 MW2027-06-30Hybrid: on-site bridge, then gridERCOT
Crusoe
+3 mo 3 steps without a public date2026-10-04
Microsoft Fairwater Atlanta
Fayetteville, GA
Community opposition
United States Microsoft636 MW636 MW2025-10-14 estGrid supplySERC
Georgia Power
— energized2026-10-04
YTL Green Data Center Park Kulai
Kulai, Johor, Malaysia
Renewables / PPA
Malaysia YTL Power600 MW600 MW2025-10-31Hybrid: on-site bridge, then gridMalaysiaon time energized—
Coreweave Helios
Afton (Dickens County), TX
Financing
United States CoreWeave528 MW132 MW2026-08-30 estGrid supplyERCOT
Galaxy Digital (ERCOT large-load interconnection)
— energized2026-10-05
Racks Central Johor AI Factory Campus
Johor, Malaysia
Malaysia Racks Central510 MW0 MW2027-03-31Grid supplyMalaysiaon time 3 steps without a public date—
Naver-Nvidia Tetouan
Tetouan, Morocco
Morocco Naver500 MW0 MW—Grid supplyMorocco— 3 steps without a public date—
DayOne Nusajaya
Iskandar Puteri, Johor, Malaysia
Renewables / PPA
Malaysia —473 MW473 MW2024-12-31 estGrid supplyMalaysia
Tenaga Nasional Berhad
— energized2026-10-04
Huawei Wuhu
Wuhu, China
China Huawei457 MW364 MW est2025-01-01 estunknownChina
State Grid Anhui (territory estimate)
— energized—
DayOne Batam Kabil Campus
Batam (Kabil), Indonesia
Indonesia DayOne450 MW150 MW est2026-09-30Grid supplyIndonesia+3 mo 3 steps without a public date—
Meta Bowling Green
Bowling Green, OH
On-site generation
United States Meta422 MW0 MW2027-06-30On-site generationPJM
Williams (Will-Power OH)
on time 2 steps without a public date2026-10-04
DayOne Kempas
Johor, Malaysia
Renewables / PPA
Malaysia —422 MW422 MW2026-01-22 estGrid supplyMalaysia
Tenaga Nasional Berhad
— energized2026-10-04
CoreWeave Ellendale ND
Ellendale, ND
United States CoreWeave400 MW88 MW est2025-10-27 estGrid supplyMISO
Otter Tail / Dakota Valley (territory estimate)
on time (build-out) energized2026-10-04
SoftBank Sakai AI Data Center
Sakai, Osaka, Japan
Japan SoftBank400 MW150 MW est2025-12-31Grid supplyJapan+12 mo 3 steps without a public date—
ByteDance Thailand AI Data Hub
Chonburi, Thailand
Thailand ByteDance400 MW0 MW—Grid supplyThailand— 3 steps without a public date—
AirTrunk SYD3
Western Sydney, NSW, Australia
Australia AirTrunk400 MW0 MW—Grid supplyAustralia— 3 steps without a public date—
Google Omaha
Omaha, NE
United States Google395 MW237 MW2024-04-08 estunknownSPP
Omaha Public Power District
— energized—
Google Columbus
Columbus, OH
United States Google386 MW303 MW2024-04-01 estunknownPJM
AEP Ohio
— energized—
Anthropic Lake Mariner
Barker, NY
United States AI XPV Platform378 MW210 MW est2026-05-31 estGrid supplyNYISO
New York Power Authority; National Grid
+3 mo (build-out) energized2026-10-05
Google Pryor (North)
Pryor, OK
United States Google368 MW368 MW2024-07-19 estunknownSPP
Grand River Dam Authority
— energized—
Meta Montgomery
Montgomery, AL
Renewables / PPA
United States Meta358 MW153 MW2026-12-31Grid supplySERC
Alabama Power
on time energized2026-10-04
Google Elmina Business Park
Elmina, Selangor, Malaysia
Malaysia Google350 MW0 MW2026-03-31Grid supplyMalaysia+14 mo 3 steps without a public date—
STACK Infrastructure NVA02
Manassas, VA
On-site generation
United States —348 MW85 MW2024-10-01 estGrid supplyPJM
Dominion Energy
— energized2026-10-04
Huawei Horinger
Horinger, Inner Mongolia, China
China Huawei346 MW184 MW2025-06-01 estunknownChina
Inner Mongolia Power Group (territory estimate)
— energized—
Colossus 1
South Memphis, TN
On-site generationPermit dispute
United States SpaceXAI340 MW340 MW2024-08-11 estHybrid: on-site bridge, then gridTVA
MLGW (TVA)
— energized2026-10-04
AWS New Albany
New Albany, OH
Rate or tariff fight
United States Amazon338 MW213 MW2024-12-01 estGrid supplyPJM
AEP Ohio
— energized2026-10-04
Google New Albany
New Albany, OH
United States Google333 MW333 MW2024-04-20 estunknownPJM
AEP Ohio
— energized—
QTS Eagle Mountain
Eagle Mountain, UT
On-site generation
United States Meta304 MW203 MW est2026-12-31 estGrid supplyWECC
Rocky Mountain Power
+6 mo (build-out) 1 step without a public date2026-10-04
Google Storey County
Storey County (TRIC), NV
United States Google300 MW161 MW2023-08-30 estunknownWECC
NV Energy
— energized—
SoftBank Tomakomai AI Data Center
Tomakomai, Hokkaido, Japan
Japan SoftBank300 MW0 MW2026-12-31Grid supplyJapan+3 mo 3 steps without a public date—
Beijing Haoyang Rayong Campus
Rayong, Thailand
Thailand Beijing Haoyang Cloud300 MW0 MW—Grid supplyThailand— 3 steps without a public date—
Google Hamina
Hamina, Finland
Finland Google300 MW300 MW est2011-09-01Grid supplyFinlandon time energized—
QTS Calatorao (Project Rodes)
Calatorao, Zaragoza, Spain
On-site generation
Spain QTS (Blackstone)300 MW0 MW—Grid supplySpain— 3 steps without a public date—
Tencent Tianjin AI Data Center
Tianjin, China
China Tencent300 MW300 MW2020-12-31Grid supplyChinaon time energized—
China Telecom Lin-gang Phase 2
Shanghai (Lin-gang), China
China China Telecom290 MW290 MW2024-12-31Grid supplyChinaon time energized—
Google Lincoln
Lincoln, NE
Renewables / PPA
United States Google283 MW141 MW2025-11-30Grid supplySPP
Lincoln Electric System
+5 mo energized2026-10-04
CoreWeave Denton TX
Denton, TX
United States CoreWeave282 MW262 MW2025-05-31 estGrid supplyERCOT
Denton Municipal Electric
— energized2026-10-04
Naver Gak Sejong
Sejong, South Korea
South Korea Naver270 MW270 MW2023-11-06Grid supplySouth Koreaon time energized—
Google Cedar Rapids
Cedar Rapids, IA
Nuclear supply
United States Google261 MW87 MW est2026-12-31Grid supplyMISO
Alliant Energy
on time 1 step without a public date2026-10-04
Meta Talavera de la Reina
Talavera de la Reina, Castilla-La Mancha, Spain
Spain Meta248 MW0 MW2026-12-31Grid supplySpain+24 mo 3 steps without a public date—
QTS Richmond 3
Sandston, VA
United States —240 MW144 MW2026-02-13 estGrid supplyPJM
Dominion Energy
— energized2026-10-04
Google Skien
Skien, Norway
Renewables / PPA
Norway Google240 MW240 MW2026-02-23 estGrid supplyNorway— energized—
QTS Richmond 1
Sandston, VA
United States —238 MW238 MW2024-01-29 estGrid supplyPJM
Dominion Energy
— energized—
Google Bristow
Bristow, VA
United States Google238 MW238 MW2024-04-29 estunknownPJM
Dominion Energy
— energized—
Google Council Bluffs (East)
Council Bluffs, IA
United States Google237 MW237 MW2024-11-19 estunknownMISO
MidAmerican Energy
— energized—
Google Papillion
Papillion, NE
United States Google237 MW237 MW2023-01-23 estunknownSPP
Omaha Public Power District
— energized—
Start Campus Sines Data Campus
Sines, Portugal
Renewables / PPA
Portugal Nscale233 MW33 MW2026-04-03 estGrid supplyPortugal
REN; EDP
— energized2026-10-04
Stream Phoenix
Goodyear, AZ
On-site generation
United States —220 MW64 MW2026-05-01 estGrid supplyWECC
Arizona Public Service
— energized2026-10-04
Meta Los Lunas
Los Lunas, NM
Renewables / PPA
United States Meta218 MW118 MW est2026-03-01 estGrid supplyWECC
PNM
— energized2026-10-04
OpenAI Stargate Lordstown
Warren, OH
United States Softbank214 MW0 MW2026-12-31Grid supplyPJM
Ohio Edison (FirstEnergy)
— 1 step without a public date2026-10-04
Meta Cheyenne
Cheyenne, WY
Renewables / PPA
United States Meta207 MW152 MW2027-03-31 estGrid supplyWECC
Black Hills Energy
— 3 steps without a public date2026-10-04
Anthropic Barber Lake
Mitchell County, TX
United States Cipher Mining207 MW168 MW est2026-09-30Grid supplyERCOT
Oncor (ERCOT)
+3 mo Building ready for IT 6 mo past deadline2026-10-05
Microsoft Goodyear
Goodyear, AZ
United States Microsoft202 MW202 MW2023-04-24 estunknownWECC
Arizona Public Service
— energized—
Khazna-Microsoft UAE Expansion
Abu Dhabi, United Arab Emirates
United Arab Emirates Khazna (G42)200 MW200 MW est2026-12-31Grid supplyUnited Arab Emirateson time 3 steps without a public date—
Schwarz Digits Lübbenau
Lübbenau, Brandenburg, Germany
Germany Schwarz Digits200 MW0 MW2027-12-31Grid supplyGermanyon time 3 steps without a public date—
Microsoft Taiwan North
Taipei, Taiwan
Taiwan Microsoft200 MW200 MW est2026-12-31Grid supplyTaiwanon time 3 steps without a public date—
Microsoft Project Osmium
Cumming, IA
United States Microsoft190 MW190 MW2021-01-01 estunknownMISO
MidAmerican Energy
— energized—
Google Mesa
Mesa, AZ
United States Google183 MW183 MW2025-07-01 estunknownWECC
Salt River Project
— energized—
QTS Richmond 2
Sandston, VA
United States —180 MW180 MW2025-02-04 estGrid supplyPJM
Dominion Energy
— energized—
Meta-QTS Hillsboro 2
Hillsboro, OR
United States Meta180 MW180 MW2023-08-02 estunknownWECC
Portland General Electric
— energized—
Meta Rosemount
Rosemount, MN
United States Meta178 MW178 MW2026-12-31Grid supplyMISO
Xcel Energy
on time energized2026-10-04
Meta Jeffersonville
Jeffersonville, IN
United States Meta178 MW178 MW2026-12-31Grid supplyMISO
Duke Energy Indiana
on time energized2026-10-04
Meta Temple
Temple, TX
FinancingRedesign pause
United States Meta178 MW178 MW2025-12-09 estGrid supplyERCOT
Oncor (ERCOT)
— energized2026-10-04
AWS Berwick
Berwick, PA
Interconnection rejectedNuclear supply
United States Amazon169 MW108 MW2025-09-09 estGrid supplyPJM
PPL Electric Utilities (PJM); Talen Energy (Susquehanna)
— energized2026-10-04
Alibaba Zhangbei
Zhangbei, Hebei, China
China Alibaba169 MW169 MW2025-09-17 estunknownChina
State Grid Hebei (territory estimate)
— energized—
Reliance-Meta Jamnagar
Jamnagar, Gujarat, India
Renewables / PPA
India Reliance Industries168 MW0 MW2028-06-30Grid supplyIndiaon time 3 steps without a public date—
Google The Dalles
The Dalles, OR
United States Google154 MW154 MW2025-03-07 estunknownWECC
Northern Wasco County PUD
— energized—
Google Red Oak
Red Oak, TX
United States Google154 MW154 MW est2025-08-25 estGrid supplyERCOT
Oncor (ERCOT)
— energized2026-10-04
CoreWeave Muskogee OK
Muskogee, OK
On-site generation
United States CoreWeave153 MW70 MW est2026-06-30Grid supplySPP
Oklahoma Gas & Electric
+6 mo 1 step without a public date2026-10-04
Meta Kuna
Kuna, ID
Redesign pause
United States Meta152 MW152 MW2025-12-31Grid supplyWECC
Idaho Power
+8 mo energized2026-10-04
AirTrunk JHB1
Iskandar Puteri, Johor, Malaysia
FinancingRenewables / PPA
Malaysia AirTrunk150 MW50 MW2024-07-30Grid supplyMalaysiaon time energized—
Meta Huntsville
Toney, AL
Redesign pause
United States Meta146 MW146 MW2026-03-04 estGrid supplySERC
Huntsville Utilities (TVA)
— energized2026-10-04
Nebius Mantsala
Mäntsälä, Finland
Finland Nebius145 MW75 MW2024-10-08 estGrid supplyFinland
Fingrid; Caruna (territory estimate)
— energized2026-10-04
Viettel Tan Phu Trung Hyperscale
Ho Chi Minh City (Cu Chi), Vietnam
Vietnam Viettel140 MW30 MW est2026-03-31Grid supplyVietnam+9 mo 3 steps without a public date—
Google Lancaster
Lancaster, OH
United States Google137 MW137 MW2024-01-01 estunknownPJM
AEP Ohio
— energized—
Meta Eagle Mountain
Eagle Mountain, UT
United States Meta133 MW133 MW2025-12-07 estGrid supplyWECC
Rocky Mountain Power
— energized2026-10-04
ESR Cosmosquare Osaka
Osaka (Cosmosquare), Japan
Japan ESR / Colt DCS130 MW25 MW2025-05-31Grid supplyJapanon time energized—
Vantage TX1
San Antonio, TX
United States —128 MW32 MW2026-02-15 estGrid supplyERCOT
CPS Energy
— energized2026-10-04
CoreWeave Chester VA
Chester, VA
United States CoreWeave113 MW82 MW2024-01-31 estunknownPJM
Dominion Energy
— energized—
Google Kansas City East
Kansas City, MO
United States Google105 MW105 MW2026-08-01 estGrid supplySPP
Evergy
— energized2026-10-04
Google Midlothian
Midlothian, TX
United States Google103 MW103 MW2026-04-19 estunknownERCOT
Oncor (ERCOT)
— energized2026-10-04
HUMAIN Riyadh Data Center
Riyadh, Saudi Arabia
Renewables / PPA
Saudi Arabia HUMAIN100 MW100 MW est2026-06-30Grid supplySaudi Arabia+6 mo 3 steps without a public date—
HUMAIN Dammam Data Center
Dammam, Saudi Arabia
Renewables / PPA
Saudi Arabia HUMAIN100 MW100 MW est2026-06-30Grid supplySaudi Arabia+6 mo 3 steps without a public date—
Foxconn-Nvidia Kaohsiung AI Supercomputing Center
Kaohsiung, Taiwan
Taiwan Foxconn (Hon Hai)100 MW100 MW est2025-06-30Grid supplyTaiwanon time energized—
Princeton Digital TY1 Saitama
Saitama, Japan
Japan Princeton Digital Group97 MW97 MW est2024-12-31Grid supplyJapanon time energized—
CoreWeave Lancaster Greenfield site
Lancaster, PA
On-site generation
United States CoreWeave92 MW0 MW2027-08-31Grid supplyPJM
PPL Electric Utilities
— 2 steps without a public date2026-10-04
Microsoft Narvik Norway
Narvik, Norway
FinancingRenewables / PPA
Norway Nscale92 MW92 MW est2027-06-30Grid supplyNorway
Statnett; Vattenfall (PPA)
— 2 steps without a public date2026-10-05
Nscale Loughton AI Campus
Loughton, Essex, United Kingdom
United Kingdom Nscale90 MW0 MW2026-12-31Grid supplyUnited Kingdom+3 mo 3 steps without a public date—
eStruxture CAL-3 (CoreWeave)
Calgary, Alberta, Canada
Canada eStruxture90 MW90 MW est2026-12-31Grid supplyCanadaon time 3 steps without a public date—
Google Waltham Cross
Cheshunt, UK
United Kingdom Google88 MW88 MW2025-09-01 estunknownUnited Kingdom
UK Power Networks
— energized—
Meta Sarpy
Springfield, NE
United States Meta80 MW80 MW2024-12-31Grid supplySPP
Omaha Public Power District
+19 mo energized2026-10-04
Google Arcola
Sterling, VA
United States Google77 MW77 MW2026-06-16 estunknownPJM
Dominion Energy
— energized—
Microsoft SAT40
San Antonio, TX
United States Microsoft75 MW75 MW2024-05-24 estunknownERCOT
CPS Energy
— energized—
Oracle Batam
Batam, Indonesia
Indonesia Oracle72 MW72 MW2025-05-15 estunknownIndonesia
PLN Batam (territory estimate)
— energized—
Meta Aiken
Trenton, SC
Renewables / PPA
United States Meta69 MW69 MW2027-05-31Grid supplySERC
Dominion Energy South Carolina
on time energized2026-10-04
CoreWeave Marble NC
Marble, NC
United States CoreWeave65 MW65 MW2026-03-13 estunknownSERC
Duke Energy Carolinas
— energized—
Core42 Lake Mariner
Barker, NY
United States Core4258 MW58 MW2025-10-01 estunknownNYISO
New York Power Authority; National Grid
— energized—
Microsoft-Nebius New Jersey
Vineland, NJ
On-site generationpermit_dispute
United States Nebius50 MW50 MW2025-08-31On-site generationPJM
Bloom Energy; Vineland Municipal Electric Utility
+7 mo energized2026-10-04
Microsoft Bornasco
Bornasco, Lombardy, Italy
Italy Microsoft50 MW0 MW—Grid supplyItaly— 3 steps without a public date—
EcoDataCenter 2
Borlänge, Sweden
Sweden Mistral AI48 MW0 MW2027-03-31Grid supplySweden
Svenska kraftnät; Borlänge Energi (territory estimate)
+3 mo 1 step without a public date2026-10-04
Microsoft SAT14
San Antonio, TX
United States Microsoft47 MW47 MW2024-07-01 estunknownERCOT
CPS Energy
— energized—
CoreWeave Norway
Øvrebø, Norway
Norway CoreWeave42 MW42 MW2025-07-27 estunknownNorway
Agder Energi (territory estimate)
— energized—
Southgate Melbourne
Melbourne, Australia
Australia Firmus41 MW41 MW2026-08-09 estunknownAustralia
AusNet / CitiPower (territory estimate)
— energized—
CoreWeave Dalton 1 & 2
Dalton, GA
United States CoreWeave28 MW28 MW2026-02-20 estunknownSERC
Dalton Utilities
— energized—
Stargate Korea Jeonnam (SK-OpenAI)
Jeollanam-do, South Korea (site not fixed)
Financing
South Korea for OpenAI20 MW0 MW—Grid supplySouth Korea— 3 steps without a public date—
Stargate Korea Pohang (Samsung-OpenAI)
Pohang, South Korea
South Korea for OpenAI20 MW0 MW—Grid supplySouth Korea— 3 steps without a public date—
xAI QTS Atlanta
Atlanta, GA
United States SpaceXAI17 MW17 MW2025-02-20 estunknownSERC
Georgia Power
— energized—
Nscale Keflavik
Reykjanesbær, Iceland
Renewables / PPA
Iceland Nscale10 MW10 MW est2026-04-23 estGrid supplyIceland
Landsnet; Landsvirkjun
— energized2026-10-04
Meta Gallatin
Gallatin, TN
Redesign pauseRenewables / PPA
United States Meta0 MW0 MW2023-12-31Grid supplyTVA
Gallatin Department of Electricity (TVA)