Bridge Data Centres MY06 · Sedenak, Johor, Malaysia

Last change recorded — · Last checked 2026-11-08

OwnerByteDance
UsersByteDance
IT power, end of 2026243 MW
Planned end state243 MW
First power2022-12-31
Build-out completeno further build-out tracked
Power pathNo data yet
Binding stepNo data yet
First power vs announcedNo announced date on record
Full build-out vs announcedNo announced date on record
Utility / power partnersNo data yet

Added by Epoch in its 2026-11-06 update: Sedenak Tech Park campus, ByteDance the likely user. Coordinates approximate. Buildings 8-10 did not appear to be in use as of 2026-09-13 (Epoch). · source ◐ secondary, confidence medium

Recorded readiness — 0 of 5 applicable milestones have a dated public record

○ Land○ Permits○ Grid supply· Generation○ Water· Financing○ Construction

Gate to first power — target 2022-12-31 (estimate) · path: unknown, generic steps assumed · each step must finish its lead time before the target

0 of 0 required steps have a public date. Red = recorded date past the rule-based deadline · grey "no public date" = required step without a record · green = on record in time · context steps never colour.

No dated steps on record.

This site is energized; lights only show how its recorded steps compared with the lead times.

Lead-time assumptions
  • Site secured 15 months before first power — Land under control and campus announced. Rarely binding; shown for context.
  • Permits in hand 0 months before first power — Final air and siting permits. Operators often energize on standard or temporary authorisations and receive the major permit later; flagged only when the permit lands more than 6 months after first power or is missing for an on-site plant.
  • Grid supply agreed 9 months before first power — Interconnection or large-load agreement approved. Observed median 7 months before first power; the physical works (substation, lines) run in parallel with construction.
  • Substation and lines energized 2 months before first power — Utility delivery point live; final tests before the load is taken.
  • New generation online 1 months before first power — Utility plant or on-site plant generating; needed just before energization when the grid cannot carry the load alone.
  • Major equipment on site 6 months before first power — Turbines, transformers, switchgear delivered; installation and commissioning take the remaining months.
  • Construction started 24 months before first power — Groundbreaking of the building that gives first power. Observed 4-26 months for recent AI campuses; Meta's redesigned campuses took 35-58.
  • Building ready for IT 0 months before first power — First building ready for IT. 'Complete' or 'opened' is usually reported after first power; flagged only beyond 3 months.
  • Full build-out complete -12 months before first power — All announced buildings operational. Comes after first power by design; context only.
  • Water supply secured 12 months before first power — Water rights, municipal agreement or desalination contract in hand. Context only; one of the feasibility items.
  • Financing closed 12 months before first power — Project financing, anchor lease or committed capital announced. Context only; not applicable when the owner is a hyperscaler building on its balance sheet.

Dated steps (from the sources; later dates are plans)

2022-12-31 First powerFirst power (Epoch) · ◐

Build-out timeline (Epoch AI; dated status notes with IT power; rows after today are estimates)

2021-10-01—Land clearing begins for campus 1, seen via satellite imagery. This start date is corroborated by the [Malaysian Investment Development Authority](https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-c
2022-12-3119 MWBuilding 1 (MY06-1) is operational. The [SEC filing for Chindata](https://www.sec.gov/Archives/edgar/data/1807192/000095017022025569/cd-ex99_1.htm) and [local news sources](https://www.malaymail.com/news/money/2022/10/21
2023-03-0119 MW[Drone footage](https://www.youtube.com/watch?v=ozi5G1Lt4Ew) indicates that Building 1 is operating at full capacity, with 4 of 5 cooling tower fans spinning. Building 2 has 2 of 21 fans spinning and some ongoing constru
2023-05-3061 MWBuilding 2 (MY06-2) is operational.
2024-11-05114 MWBuilding 3 and 4 are operational. Building 3 was [originally scheduled](https://www.sec.gov/Archives/edgar/data/1807192/000119312523034103/d282677dex994.htm) for 2024Q4, and seemed partly operational in June, so it's lik
2025-02-09114 MWConstruction looks complete on Building 5, 6 and 7, but we allow 3 more months for fit-out and ramping before declaring them operational.
2025-05-25243 MWBuildings 5-7 are operational.
2025-09-23243 MWBuildings 8 and 9 look structurally complete. The remaining building, building 10, still has construction material around it and scaffolding on the roof, with cooling units yet to be installed.
2026-03-03243 MWAll cooling units are now installed on Building 10. [Drone footage](https://www.youtube.com/watch?v=BVdGV8FFaLw) from the same month shows most cooling units operating for Buildings 5-7, but none (or very few) for Buildi
2026-09-13243 MWNo visible construction work on Buildings 8-10, but no cars in their carparks either (whereas Building 7 has many cars). So we still don't think Buildings 8-10 are utilized.

Recorded fact The site is energized.

Calculated requirement Energized; watch the build-out timeline for the next buildings.

Sources (Epoch AI selection): Bridge Data Centers 2025 article about MY06 · Drone footage from 2024 · Development authority linking Bytedance · Street view linking second campus MY06-2

Epoch AI, 'AI data centers', epoch.ai/data/ai-data-centers (CC BY 4.0); coordinates from GeoNames cities500 (CC BY 4.0) and hand-entered places; overrides in tools/project_overrides.csv with their own sources. Campuses outside the Epoch dataset come from tools/campuses.csv (public reporting, source per row). Data retrieved 2026-11-09. Report a correction to contact@ailoadmap.com (campus id bridge-data-centres-my06; include the row and a source link).