Every tracked campus with its power path, grid operator, first-power target and gate status. Filter and sort; the filter state is in the address so a view can be linked. Data: Epoch AI (CC BY 4.0) plus sourced steps; see Method.
146 campuses · 89.5 GW planned · 21.9 GW of IT power expected online by end of 2026 (incl. estimates)
| Campus | Country | Operator | Planned ▼ | End 2026 | First power | Power path | Grid / partner | Slip | Gate | Last update |
|---|---|---|---|---|---|---|---|---|---|---|
| Wonder Valley MD of Greenview (south of Grande Prairie), Alberta, Canada | Canada | Wonder Valley (O'Leary Ventures) | 7.5 GW | 0 MW | — | On-site generation | Canada | — | 4 steps without a public date | — |
| ByteDance Ulanqab Expansion Ulanqab, Inner Mongolia, China | China | ByteDance | 5.5 GW | 0 MW | 2028-03-31 | Grid supply | China | on time | 3 steps without a public date | — |
| Scala AI City Eldorado do Sul, Rio Grande do Sul, Brazil | Brazil | Scala Data Centers | 4.8 GW | 54 MW | 2026-06-30 | Grid supply | Brazil | on time | energized | — |
| Elea Rio AI City Rio de Janeiro, Brazil | Brazil | Elea Data Centers | 3.2 GW | 80 MW est | 2026-12-31 | Grid supply | Brazil | on time | 3 steps without a public date | — |
| Haenam Solar City AI Data Center Haenam, Jeollanam-do, South Korea | South Korea | Stock Farm Road | 3.0 GW | 0 MW | 2028-12-31 est | Hybrid: on-site bridge, then grid | South Korea | — | 5 steps without a public date | — |
| Syncline Energy Melbourne Hub North-west Melbourne, Victoria, Australia | Australia | Syncline Energy | 2.4 GW | 0 MW | — | Grid supply | Australia | — | 3 steps without a public date | — |
| Microsoft Fairwater Wisconsin Mount Pleasant, WI | United States | Microsoft | 2.3 GW | 369 MW | 2026-04-16 est | Grid supply | MISO We Energies (WEC) | — | energized | 2026-10-04 |
| Western Downs Digital Park (Anthropic) Dalby, Queensland, Australia | Australia | Zerra DC | 2.2 GW | 0 MW | 2027-12-31 | Grid supply | Australia | on time | 3 steps without a public date | — |
| Envision Galaxy Campus Ulanqab Ulanqab, Inner Mongolia, China | China | Envision | 2.0 GW | 2.0 GW | 2026-08-06 | Hybrid: on-site bridge, then grid | China | on time | energized | — |
| Anthropic-Amazon New Carlisle New Carlisle, IN | United States | Amazon | 1.9 GW | 1.0 GW est | 2025-06-23 est | Grid, with new utility generation | PJM Indiana Michigan Power (AEP) | — | energized | 2026-10-04 |
| Meta Sturgeon County Sturgeon County, Alberta, Canada | Canada | Meta | 1.8 GW | 0 MW | 2028-12-31 | Grid, with new utility generation | Canada | on time | 4 steps without a public date | — |
| OpenAI Stargate New Mexico Doña Ana County, NM | United States | Oracle | 1.8 GW | 0 MW | 2026-12-31 | On-site generation | WECC Bloom Energy / BorderPlex Digital Assets | — | Major equipment on site 8 mo past deadline | 2026-10-05 |
| Meta Hyperion Holly Ridge, Richland Parish, LA | United States | Meta | 1.6 GW | 0 MW est | 2028-01-01 | Grid, with new utility generation | MISO Entergy Louisiana | on time | New generation online 7 mo past deadline | 2026-10-04 |
| Colossus 2 South Memphis, TN | United States | SpaceXAI | 1.5 GW | 946 MW | 2025-10-19 est | Hybrid: on-site bridge, then grid | TVA MLGW (TVA) | — | energized | 2026-10-04 |
| Reliance Visakhapatnam AI Cluster Visakhapatnam, Andhra Pradesh, India | India | Reliance Industries | 1.5 GW | 0 MW | 2028-10-31 | Hybrid: on-site bridge, then grid | India | on time | 5 steps without a public date | — |
| OpenAI Stargate Shackelford Shackelford County, TX | United States | Oracle | 1.4 GW | 0 MW | 2026-12-01 | Hybrid: on-site bridge, then grid | ERCOT VoltaGrid | +8 mo | 3 steps without a public date | 2026-10-04 |
| CDC Wagga Wagga Campus Wagga Wagga, NSW, Australia | Australia | CDC Data Centres | 1.4 GW | 0 MW | — | Grid supply | Australia | — | 3 steps without a public date | — |
| Campus AI Paris (Fouju) Fouju, Seine-et-Marne, France | France | MGX / Bpifrance / Mistral AI / Nvidia | 1.4 GW | 0 MW | 2028-06-30 | Grid supply | France | on time | 3 steps without a public date | — |
| Bell AI Fabric Sherwood RM of Sherwood (Regina), Saskatchewan, Canada | Canada | Bell Canada | 1.2 GW | 0 MW | 2027-06-30 | Grid supply | Canada | on time | 3 steps without a public date | — |
| QTS Cedar Rapids Fairfax, IA | United States | — | 1.1 GW | 448 MW est | 2026-12-31 | Grid supply | MISO Alliant Energy | on time | 1 step without a public date | 2026-10-04 |
| Meta Prometheus New Albany, OH | United States | Meta | 1.0 GW | 676 MW est | 2025-10-14 est | Hybrid: on-site bridge, then grid | PJM Williams (Will-Power OH) | — | energized | 2026-10-04 |
| Goodnight Claude (Armstrong County), TX | United States | 1.0 GW | 0 MW | 2027-12-31 | Hybrid: on-site bridge, then grid | ERCOT Serena (Goodnight Wind); Crusoe | on time | 3 steps without a public date | 2026-10-04 | |
| OpenAI Stargate UAE Abu Dhabi, United Arab Emirates | United Arab Emirates | G42 | 1.0 GW | 200 MW est | 2026-09-30 | Grid supply | United Arab Emirates EWEC / Khazna (G42) | +2 mo | 2 steps without a public date | 2026-10-04 |
| SK-AWS Ulsan AI Data Center Ulsan (Mipo), South Korea | South Korea | for Amazon | 1.0 GW | 0 MW | 2027-11-30 | Grid supply | South Korea | on time | 3 steps without a public date | — |
| Google Visakhapatnam AI Hub Visakhapatnam, Andhra Pradesh, India | India | 1.0 GW | 0 MW | 2028-12-31 | Grid supply | India | on time | 3 steps without a public date | — | |
| Microsoft-G42 Olkaria Kenya Naivasha (Olkaria), Kenya | Kenya | EcoCloud | 1.0 GW | 0 MW | — | Grid supply | Kenya | — | 3 steps without a public date | — |
| ByteDance Pecém Pecém (São Gonçalo do Amarante), Ceará, Brazil | Brazil | ByteDance | 1.0 GW | 0 MW | 2027-09-30 | Grid supply | Brazil | on time | 3 steps without a public date | — |
| OpenAI Stargate Michigan Saline Township, MI | United States | Oracle | 988 MW | 0 MW | — | Grid supply | MISO DTE Electric | on time (build-out) | 2 steps without a public date | 2026-10-04 |
| OpenAI Stargate Wisconsin Port Washington, WI | United States | Oracle | 902 MW | 0 MW | 2028-06-30 est | Grid supply | MISO We Energies (WEC); American Transmission Co. | on time (build-out) | 1 step without a public date | 2026-10-04 |
| CloudHQ Querétaro Querétaro, Mexico | Mexico | CloudHQ | 900 MW | 0 MW | 2027-06-30 | Grid supply | Mexico | on time | 3 steps without a public date | — |
| Google Fort Wayne Fort Wayne, IN | United States | 863 MW | 173 MW est | 2026-09-15 est | Grid supply | PJM Indiana Michigan Power (AEP) | — | energized | 2026-10-04 | |
| OpenAI Stargate Milam Milam County, TX | United States | Softbank | 857 MW | 0 MW | 2026-10-31 | Hybrid: on-site bridge, then grid | ERCOT SB Energy | on time (build-out) | 3 steps without a public date | 2026-10-05 |
| OpenAI Stargate Abilene Abilene, TX | United States | Oracle | 843 MW | 843 MW est | 2025-09-30 | Hybrid: on-site bridge, then grid | ERCOT AEP Texas | on time | energized | 2026-10-04 |
| Amazon Ridgeland Ridgeland, MS | United States | Amazon | 840 MW | 228 MW | 2026-05-15 est | Grid, with new utility generation | MISO Entergy Mississippi | — | energized | 2026-10-04 |
| Brookfield Strängnäs AI Hub Strängnäs, Sweden | Sweden | Brookfield | 750 MW | 0 MW | — | Grid supply | Sweden | — | 3 steps without a public date | — |
| QTS Cambois (Blyth) Cambois, Northumberland, United Kingdom | United Kingdom | QTS (Blackstone) | 720 MW | 0 MW | — | Grid supply | United Kingdom | — | 3 steps without a public date | — |
| VNET Bayin Ulanqab Ulanqab, Inner Mongolia, China | China | VNET | 700 MW | 221 MW | 2025-07-01 est | unknown | China State Grid Inner Mongolia (territory estimate) | — | energized | — |
| Amazon Madison Mega Site Madison County, MS | United States | Amazon | 683 MW | 284 MW | 2025-06-23 est | Grid, with new utility generation | MISO Entergy Mississippi | +2 mo (build-out) | energized | 2026-10-04 |
| Crusoe Abilene Expansion Abilene, TX | United States | Microsoft | 672 MW | 0 MW | 2027-06-30 | Hybrid: on-site bridge, then grid | ERCOT Crusoe | +3 mo | 3 steps without a public date | 2026-10-04 |
| Microsoft Fairwater Atlanta Fayetteville, GA | United States | Microsoft | 636 MW | 636 MW | 2025-10-14 est | Grid supply | SERC Georgia Power | — | energized | 2026-10-04 |
| YTL Green Data Center Park Kulai Kulai, Johor, Malaysia | Malaysia | YTL Power | 600 MW | 600 MW | 2025-10-31 | Hybrid: on-site bridge, then grid | Malaysia | on time | energized | — |
| Coreweave Helios Afton (Dickens County), TX | United States | CoreWeave | 528 MW | 132 MW | 2026-08-30 est | Grid supply | ERCOT Galaxy Digital (ERCOT large-load interconnection) | — | energized | 2026-10-05 |
| Racks Central Johor AI Factory Campus Johor, Malaysia | Malaysia | Racks Central | 510 MW | 0 MW | 2027-03-31 | Grid supply | Malaysia | on time | 3 steps without a public date | — |
| Naver-Nvidia Tetouan Tetouan, Morocco | Morocco | Naver | 500 MW | 0 MW | — | Grid supply | Morocco | — | 3 steps without a public date | — |
| DayOne Nusajaya Iskandar Puteri, Johor, Malaysia | Malaysia | — | 473 MW | 473 MW | 2024-12-31 est | Grid supply | Malaysia Tenaga Nasional Berhad | — | energized | 2026-10-04 |
| Huawei Wuhu Wuhu, China | China | Huawei | 457 MW | 364 MW est | 2025-01-01 est | unknown | China State Grid Anhui (territory estimate) | — | energized | — |
| DayOne Batam Kabil Campus Batam (Kabil), Indonesia | Indonesia | DayOne | 450 MW | 150 MW est | 2026-09-30 | Grid supply | Indonesia | +3 mo | 3 steps without a public date | — |
| Meta Bowling Green Bowling Green, OH | United States | Meta | 422 MW | 0 MW | 2027-06-30 | On-site generation | PJM Williams (Will-Power OH) | on time | 2 steps without a public date | 2026-10-04 |
| DayOne Kempas Johor, Malaysia | Malaysia | — | 422 MW | 422 MW | 2026-01-22 est | Grid supply | Malaysia Tenaga Nasional Berhad | — | energized | 2026-10-04 |
| CoreWeave Ellendale ND Ellendale, ND | United States | CoreWeave | 400 MW | 88 MW est | 2025-10-27 est | Grid supply | MISO Otter Tail / Dakota Valley (territory estimate) | on time (build-out) | energized | 2026-10-04 |
| SoftBank Sakai AI Data Center Sakai, Osaka, Japan | Japan | SoftBank | 400 MW | 150 MW est | 2025-12-31 | Grid supply | Japan | +12 mo | 3 steps without a public date | — |
| ByteDance Thailand AI Data Hub Chonburi, Thailand | Thailand | ByteDance | 400 MW | 0 MW | — | Grid supply | Thailand | — | 3 steps without a public date | — |
| AirTrunk SYD3 Western Sydney, NSW, Australia | Australia | AirTrunk | 400 MW | 0 MW | — | Grid supply | Australia | — | 3 steps without a public date | — |
| Google Omaha Omaha, NE | United States | 395 MW | 237 MW | 2024-04-08 est | unknown | SPP Omaha Public Power District | — | energized | — | |
| Google Columbus Columbus, OH | United States | 386 MW | 303 MW | 2024-04-01 est | unknown | PJM AEP Ohio | — | energized | — | |
| Anthropic Lake Mariner Barker, NY | United States | AI XPV Platform | 378 MW | 210 MW est | 2026-05-31 est | Grid supply | NYISO New York Power Authority; National Grid | +3 mo (build-out) | energized | 2026-10-05 |
| Google Pryor (North) Pryor, OK | United States | 368 MW | 368 MW | 2024-07-19 est | unknown | SPP Grand River Dam Authority | — | energized | — | |
| Meta Montgomery Montgomery, AL | United States | Meta | 358 MW | 153 MW | 2026-12-31 | Grid supply | SERC Alabama Power | on time | energized | 2026-10-04 |
| Google Elmina Business Park Elmina, Selangor, Malaysia | Malaysia | 350 MW | 0 MW | 2026-03-31 | Grid supply | Malaysia | +14 mo | 3 steps without a public date | — | |
| STACK Infrastructure NVA02 Manassas, VA | United States | — | 348 MW | 85 MW | 2024-10-01 est | Grid supply | PJM Dominion Energy | — | energized | 2026-10-04 |
| Huawei Horinger Horinger, Inner Mongolia, China | China | Huawei | 346 MW | 184 MW | 2025-06-01 est | unknown | China Inner Mongolia Power Group (territory estimate) | — | energized | — |
| Colossus 1 South Memphis, TN | United States | SpaceXAI | 340 MW | 340 MW | 2024-08-11 est | Hybrid: on-site bridge, then grid | TVA MLGW (TVA) | — | energized | 2026-10-04 |
| AWS New Albany New Albany, OH | United States | Amazon | 338 MW | 213 MW | 2024-12-01 est | Grid supply | PJM AEP Ohio | — | energized | 2026-10-04 |
| Google New Albany New Albany, OH | United States | 333 MW | 333 MW | 2024-04-20 est | unknown | PJM AEP Ohio | — | energized | — | |
| QTS Eagle Mountain Eagle Mountain, UT | United States | Meta | 304 MW | 203 MW est | 2026-12-31 est | Grid supply | WECC Rocky Mountain Power | +6 mo (build-out) | 1 step without a public date | 2026-10-04 |
| Google Storey County Storey County (TRIC), NV | United States | 300 MW | 161 MW | 2023-08-30 est | unknown | WECC NV Energy | — | energized | — | |
| SoftBank Tomakomai AI Data Center Tomakomai, Hokkaido, Japan | Japan | SoftBank | 300 MW | 0 MW | 2026-12-31 | Grid supply | Japan | +3 mo | 3 steps without a public date | — |
| Beijing Haoyang Rayong Campus Rayong, Thailand | Thailand | Beijing Haoyang Cloud | 300 MW | 0 MW | — | Grid supply | Thailand | — | 3 steps without a public date | — |
| Google Hamina Hamina, Finland | Finland | 300 MW | 300 MW est | 2011-09-01 | Grid supply | Finland | on time | energized | — | |
| QTS Calatorao (Project Rodes) Calatorao, Zaragoza, Spain | Spain | QTS (Blackstone) | 300 MW | 0 MW | — | Grid supply | Spain | — | 3 steps without a public date | — |
| Tencent Tianjin AI Data Center Tianjin, China | China | Tencent | 300 MW | 300 MW | 2020-12-31 | Grid supply | China | on time | energized | — |
| China Telecom Lin-gang Phase 2 Shanghai (Lin-gang), China | China | China Telecom | 290 MW | 290 MW | 2024-12-31 | Grid supply | China | on time | energized | — |
| Google Lincoln Lincoln, NE | United States | 283 MW | 141 MW | 2025-11-30 | Grid supply | SPP Lincoln Electric System | +5 mo | energized | 2026-10-04 | |
| CoreWeave Denton TX Denton, TX | United States | CoreWeave | 282 MW | 262 MW | 2025-05-31 est | Grid supply | ERCOT Denton Municipal Electric | — | energized | 2026-10-04 |
| Naver Gak Sejong Sejong, South Korea | South Korea | Naver | 270 MW | 270 MW | 2023-11-06 | Grid supply | South Korea | on time | energized | — |
| Google Cedar Rapids Cedar Rapids, IA | United States | 261 MW | 87 MW est | 2026-12-31 | Grid supply | MISO Alliant Energy | on time | 1 step without a public date | 2026-10-04 | |
| Meta Talavera de la Reina Talavera de la Reina, Castilla-La Mancha, Spain | Spain | Meta | 248 MW | 0 MW | 2026-12-31 | Grid supply | Spain | +24 mo | 3 steps without a public date | — |
| QTS Richmond 3 Sandston, VA | United States | — | 240 MW | 144 MW | 2026-02-13 est | Grid supply | PJM Dominion Energy | — | energized | 2026-10-04 |
| Google Skien Skien, Norway | Norway | 240 MW | 240 MW | 2026-02-23 est | Grid supply | Norway | — | energized | — | |
| QTS Richmond 1 Sandston, VA | United States | — | 238 MW | 238 MW | 2024-01-29 est | Grid supply | PJM Dominion Energy | — | energized | — |
| Google Bristow Bristow, VA | United States | 238 MW | 238 MW | 2024-04-29 est | unknown | PJM Dominion Energy | — | energized | — | |
| Google Council Bluffs (East) Council Bluffs, IA | United States | 237 MW | 237 MW | 2024-11-19 est | unknown | MISO MidAmerican Energy | — | energized | — | |
| Google Papillion Papillion, NE | United States | 237 MW | 237 MW | 2023-01-23 est | unknown | SPP Omaha Public Power District | — | energized | — | |
| Start Campus Sines Data Campus Sines, Portugal | Portugal | Nscale | 233 MW | 33 MW | 2026-04-03 est | Grid supply | Portugal REN; EDP | — | energized | 2026-10-04 |
| Stream Phoenix Goodyear, AZ | United States | — | 220 MW | 64 MW | 2026-05-01 est | Grid supply | WECC Arizona Public Service | — | energized | 2026-10-04 |
| Meta Los Lunas Los Lunas, NM | United States | Meta | 218 MW | 118 MW est | 2026-03-01 est | Grid supply | WECC PNM | — | energized | 2026-10-04 |
| OpenAI Stargate Lordstown Warren, OH | United States | Softbank | 214 MW | 0 MW | 2026-12-31 | Grid supply | PJM Ohio Edison (FirstEnergy) | — | 1 step without a public date | 2026-10-04 |
| Meta Cheyenne Cheyenne, WY | United States | Meta | 207 MW | 152 MW | 2027-03-31 est | Grid supply | WECC Black Hills Energy | — | 3 steps without a public date | 2026-10-04 |
| Anthropic Barber Lake Mitchell County, TX | United States | Cipher Mining | 207 MW | 168 MW est | 2026-09-30 | Grid supply | ERCOT Oncor (ERCOT) | +3 mo | Building ready for IT 6 mo past deadline | 2026-10-05 |
| Microsoft Goodyear Goodyear, AZ | United States | Microsoft | 202 MW | 202 MW | 2023-04-24 est | unknown | WECC Arizona Public Service | — | energized | — |
| Khazna-Microsoft UAE Expansion Abu Dhabi, United Arab Emirates | United Arab Emirates | Khazna (G42) | 200 MW | 200 MW est | 2026-12-31 | Grid supply | United Arab Emirates | on time | 3 steps without a public date | — |
| Schwarz Digits Lübbenau Lübbenau, Brandenburg, Germany | Germany | Schwarz Digits | 200 MW | 0 MW | 2027-12-31 | Grid supply | Germany | on time | 3 steps without a public date | — |
| Microsoft Taiwan North Taipei, Taiwan | Taiwan | Microsoft | 200 MW | 200 MW est | 2026-12-31 | Grid supply | Taiwan | on time | 3 steps without a public date | — |
| Microsoft Project Osmium Cumming, IA | United States | Microsoft | 190 MW | 190 MW | 2021-01-01 est | unknown | MISO MidAmerican Energy | — | energized | — |
| Google Mesa Mesa, AZ | United States | 183 MW | 183 MW | 2025-07-01 est | unknown | WECC Salt River Project | — | energized | — | |
| QTS Richmond 2 Sandston, VA | United States | — | 180 MW | 180 MW | 2025-02-04 est | Grid supply | PJM Dominion Energy | — | energized | — |
| Meta-QTS Hillsboro 2 Hillsboro, OR | United States | Meta | 180 MW | 180 MW | 2023-08-02 est | unknown | WECC Portland General Electric | — | energized | — |
| Meta Rosemount Rosemount, MN | United States | Meta | 178 MW | 178 MW | 2026-12-31 | Grid supply | MISO Xcel Energy | on time | energized | 2026-10-04 |
| Meta Jeffersonville Jeffersonville, IN | United States | Meta | 178 MW | 178 MW | 2026-12-31 | Grid supply | MISO Duke Energy Indiana | on time | energized | 2026-10-04 |
| Meta Temple Temple, TX | United States | Meta | 178 MW | 178 MW | 2025-12-09 est | Grid supply | ERCOT Oncor (ERCOT) | — | energized | 2026-10-04 |
| AWS Berwick Berwick, PA | United States | Amazon | 169 MW | 108 MW | 2025-09-09 est | Grid supply | PJM PPL Electric Utilities (PJM); Talen Energy (Susquehanna) | — | energized | 2026-10-04 |
| Alibaba Zhangbei Zhangbei, Hebei, China | China | Alibaba | 169 MW | 169 MW | 2025-09-17 est | unknown | China State Grid Hebei (territory estimate) | — | energized | — |
| Reliance-Meta Jamnagar Jamnagar, Gujarat, India | India | Reliance Industries | 168 MW | 0 MW | 2028-06-30 | Grid supply | India | on time | 3 steps without a public date | — |
| Google The Dalles The Dalles, OR | United States | 154 MW | 154 MW | 2025-03-07 est | unknown | WECC Northern Wasco County PUD | — | energized | — | |
| Google Red Oak Red Oak, TX | United States | 154 MW | 154 MW est | 2025-08-25 est | Grid supply | ERCOT Oncor (ERCOT) | — | energized | 2026-10-04 | |
| CoreWeave Muskogee OK Muskogee, OK | United States | CoreWeave | 153 MW | 70 MW est | 2026-06-30 | Grid supply | SPP Oklahoma Gas & Electric | +6 mo | 1 step without a public date | 2026-10-04 |
| Meta Kuna Kuna, ID | United States | Meta | 152 MW | 152 MW | 2025-12-31 | Grid supply | WECC Idaho Power | +8 mo | energized | 2026-10-04 |
| AirTrunk JHB1 Iskandar Puteri, Johor, Malaysia | Malaysia | AirTrunk | 150 MW | 50 MW | 2024-07-30 | Grid supply | Malaysia | on time | energized | — |
| Meta Huntsville Toney, AL | United States | Meta | 146 MW | 146 MW | 2026-03-04 est | Grid supply | SERC Huntsville Utilities (TVA) | — | energized | 2026-10-04 |
| Nebius Mantsala Mäntsälä, Finland | Finland | Nebius | 145 MW | 75 MW | 2024-10-08 est | Grid supply | Finland Fingrid; Caruna (territory estimate) | — | energized | 2026-10-04 |
| Viettel Tan Phu Trung Hyperscale Ho Chi Minh City (Cu Chi), Vietnam | Vietnam | Viettel | 140 MW | 30 MW est | 2026-03-31 | Grid supply | Vietnam | +9 mo | 3 steps without a public date | — |
| Google Lancaster Lancaster, OH | United States | 137 MW | 137 MW | 2024-01-01 est | unknown | PJM AEP Ohio | — | energized | — | |
| Meta Eagle Mountain Eagle Mountain, UT | United States | Meta | 133 MW | 133 MW | 2025-12-07 est | Grid supply | WECC Rocky Mountain Power | — | energized | 2026-10-04 |
| ESR Cosmosquare Osaka Osaka (Cosmosquare), Japan | Japan | ESR / Colt DCS | 130 MW | 25 MW | 2025-05-31 | Grid supply | Japan | on time | energized | — |
| Vantage TX1 San Antonio, TX | United States | — | 128 MW | 32 MW | 2026-02-15 est | Grid supply | ERCOT CPS Energy | — | energized | 2026-10-04 |
| CoreWeave Chester VA Chester, VA | United States | CoreWeave | 113 MW | 82 MW | 2024-01-31 est | unknown | PJM Dominion Energy | — | energized | — |
| Google Kansas City East Kansas City, MO | United States | 105 MW | 105 MW | 2026-08-01 est | Grid supply | SPP Evergy | — | energized | 2026-10-04 | |
| Google Midlothian Midlothian, TX | United States | 103 MW | 103 MW | 2026-04-19 est | unknown | ERCOT Oncor (ERCOT) | — | energized | 2026-10-04 | |
| HUMAIN Riyadh Data Center Riyadh, Saudi Arabia | Saudi Arabia | HUMAIN | 100 MW | 100 MW est | 2026-06-30 | Grid supply | Saudi Arabia | +6 mo | 3 steps without a public date | — |
| HUMAIN Dammam Data Center Dammam, Saudi Arabia | Saudi Arabia | HUMAIN | 100 MW | 100 MW est | 2026-06-30 | Grid supply | Saudi Arabia | +6 mo | 3 steps without a public date | — |
| Foxconn-Nvidia Kaohsiung AI Supercomputing Center Kaohsiung, Taiwan | Taiwan | Foxconn (Hon Hai) | 100 MW | 100 MW est | 2025-06-30 | Grid supply | Taiwan | on time | energized | — |
| Princeton Digital TY1 Saitama Saitama, Japan | Japan | Princeton Digital Group | 97 MW | 97 MW est | 2024-12-31 | Grid supply | Japan | on time | energized | — |
| CoreWeave Lancaster Greenfield site Lancaster, PA | United States | CoreWeave | 92 MW | 0 MW | 2027-08-31 | Grid supply | PJM PPL Electric Utilities | — | 2 steps without a public date | 2026-10-04 |
| Microsoft Narvik Norway Narvik, Norway | Norway | Nscale | 92 MW | 92 MW est | 2027-06-30 | Grid supply | Norway Statnett; Vattenfall (PPA) | — | 2 steps without a public date | 2026-10-05 |
| Nscale Loughton AI Campus Loughton, Essex, United Kingdom | United Kingdom | Nscale | 90 MW | 0 MW | 2026-12-31 | Grid supply | United Kingdom | +3 mo | 3 steps without a public date | — |
| eStruxture CAL-3 (CoreWeave) Calgary, Alberta, Canada | Canada | eStruxture | 90 MW | 90 MW est | 2026-12-31 | Grid supply | Canada | on time | 3 steps without a public date | — |
| Google Waltham Cross Cheshunt, UK | United Kingdom | 88 MW | 88 MW | 2025-09-01 est | unknown | United Kingdom UK Power Networks | — | energized | — | |
| Meta Sarpy Springfield, NE | United States | Meta | 80 MW | 80 MW | 2024-12-31 | Grid supply | SPP Omaha Public Power District | +19 mo | energized | 2026-10-04 |
| Google Arcola Sterling, VA | United States | 77 MW | 77 MW | 2026-06-16 est | unknown | PJM Dominion Energy | — | energized | — | |
| Microsoft SAT40 San Antonio, TX | United States | Microsoft | 75 MW | 75 MW | 2024-05-24 est | unknown | ERCOT CPS Energy | — | energized | — |
| Oracle Batam Batam, Indonesia | Indonesia | Oracle | 72 MW | 72 MW | 2025-05-15 est | unknown | Indonesia PLN Batam (territory estimate) | — | energized | — |
| Meta Aiken Trenton, SC | United States | Meta | 69 MW | 69 MW | 2027-05-31 | Grid supply | SERC Dominion Energy South Carolina | on time | energized | 2026-10-04 |
| CoreWeave Marble NC Marble, NC | United States | CoreWeave | 65 MW | 65 MW | 2026-03-13 est | unknown | SERC Duke Energy Carolinas | — | energized | — |
| Core42 Lake Mariner Barker, NY | United States | Core42 | 58 MW | 58 MW | 2025-10-01 est | unknown | NYISO New York Power Authority; National Grid | — | energized | — |
| Microsoft-Nebius New Jersey Vineland, NJ | United States | Nebius | 50 MW | 50 MW | 2025-08-31 | On-site generation | PJM Bloom Energy; Vineland Municipal Electric Utility | +7 mo | energized | 2026-10-04 |
| Microsoft Bornasco Bornasco, Lombardy, Italy | Italy | Microsoft | 50 MW | 0 MW | — | Grid supply | Italy | — | 3 steps without a public date | — |
| EcoDataCenter 2 Borlänge, Sweden | Sweden | Mistral AI | 48 MW | 0 MW | 2027-03-31 | Grid supply | Sweden Svenska kraftnät; Borlänge Energi (territory estimate) | +3 mo | 1 step without a public date | 2026-10-04 |
| Microsoft SAT14 San Antonio, TX | United States | Microsoft | 47 MW | 47 MW | 2024-07-01 est | unknown | ERCOT CPS Energy | — | energized | — |
| CoreWeave Norway Øvrebø, Norway | Norway | CoreWeave | 42 MW | 42 MW | 2025-07-27 est | unknown | Norway Agder Energi (territory estimate) | — | energized | — |
| Southgate Melbourne Melbourne, Australia | Australia | Firmus | 41 MW | 41 MW | 2026-08-09 est | unknown | Australia AusNet / CitiPower (territory estimate) | — | energized | — |
| CoreWeave Dalton 1 & 2 Dalton, GA | United States | CoreWeave | 28 MW | 28 MW | 2026-02-20 est | unknown | SERC Dalton Utilities | — | energized | — |
| Stargate Korea Jeonnam (SK-OpenAI) Jeollanam-do, South Korea (site not fixed) | South Korea | for OpenAI | 20 MW | 0 MW | — | Grid supply | South Korea | — | 3 steps without a public date | — |
| Stargate Korea Pohang (Samsung-OpenAI) Pohang, South Korea | South Korea | for OpenAI | 20 MW | 0 MW | — | Grid supply | South Korea | — | 3 steps without a public date | — |
| xAI QTS Atlanta Atlanta, GA | United States | SpaceXAI | 17 MW | 17 MW | 2025-02-20 est | unknown | SERC Georgia Power | — | energized | — |
| Nscale Keflavik Reykjanesbær, Iceland | Iceland | Nscale | 10 MW | 10 MW est | 2026-04-23 est | Grid supply | Iceland Landsnet; Landsvirkjun | — | energized | 2026-10-04 |
| Meta Gallatin Gallatin, TN | United States | Meta | 0 MW | 0 MW | 2023-12-31 | Grid supply | TVA Gallatin Department of Electricity (TVA) | +10 mo | energized | 2026-10-04 |