Planned IT power, by operator
95 GW of AI data-center capacity is planned at tracked campuses. Meta 10.0 GW, Others 9.9 GW, ByteDance 7.8 GW.
Meta10.0 GW
Others9.9 GW
ByteDance7.8 GW
Google7.8 GW
Wonder Valley7.5 GW
Amazon6.2 GW
Microsoft6.1 GW
Oracle / Stargate5.9 GW
Scala4.8 GW
OpenAI3.8 GW
Elea3.2 GW
Stock Farm Road (Haenam)3.0 GW
Anthropic2.7 GW
Syncline Energy2.4 GW
Envision2.0 GW
IREN2.0 GW
xAI1.9 GW
Reliance1.5 GW
CDC1.4 GW
Mistral AI / MGX (Paris)1.4 GW
YTL Power1.2 GW
Bell1.2 GW
QTS (Blackstone)1.0 GW
Operator = the owner when it is a hyperscaler, else the named hyperscaler tenant, else the owner; any operator with 1 GW+ planned gets its own colour. Largest in "Others": CloudHQ Querétaro 900 MW, Brookfield Strängnäs AI Hub 750 MW, Racks Central Johor AI Factory Campus 510 MW.
Tracked campuses only. Coverage differs by country; China is undercounted.Data 2026-W45 (2026-11-09) · AI Loadmap · ailoadmap.com · CC BY 4.0 · Epoch AI "AI data centers" CC BY 4.0 for the campuses it covers