AILoadmapAI gigawatts, campus by campus
← The AI Infrastructure Race

Planned IT power, by operator

90 GW of AI data-center capacity is planned at tracked campuses. Others 12 GW, Google 7.8 GW, Meta 7.7 GW.

Planned IT power, by operator · planned IT GW, all tracked campuses · announced end state · data 2026-10-05
Others12 GW
Google7.8 GW
Meta7.7 GW
ByteDance7.6 GW
Wonder Valley7.5 GW
Microsoft6.1 GW
Oracle / Stargate6.0 GW
Amazon5.0 GW
Scala4.8 GW
OpenAI3.8 GW
Elea3.2 GW
Stock Farm Road (Haenam)3.0 GW
Anthropic2.7 GW
Syncline Energy2.4 GW
Envision2.0 GW
xAI1.9 GW
Reliance1.5 GW
CDC1.4 GW
Mistral AI / MGX (Paris)1.4 GW
Bell1.2 GW
QTS (Blackstone)1.0 GW

Operator = the owner when it is a hyperscaler, else the named hyperscaler tenant, else the owner; any operator with 1 GW+ planned gets its own colour. Largest in "Others": QTS Cedar Rapids 1.1 GW, CloudHQ Querétaro 900 MW, Brookfield Strängnäs AI Hub 750 MW.

Tracked campuses only. Coverage differs by country.Data 2026-W41 (2026-10-05) · AI Loadmap · ailoadmap.com · CC BY 4.0 · Epoch AI "AI data centers" CC BY 4.0 for the campuses it covers